O
San Antonio
← San Antonio

San Antonio · issues

Civic issues

Topics getting the most attention in San Antonio public meetings, ranked by how frequently they come up.

14 issues (filtered)53 topics
HighRoads↑Rising

FY 2027 Budget and 2027-2032 Bond Program Infrastructure Priorities

The council was set to receive a briefing and vote on a resolution for the next bond program — about $617 million in total investment including streets, drainage, parks, facilities and housing. Earlier discussion flagged that anything above roughly $442 million could require a property tax increase, and a proposed stormwater fee increase of roughly $0.25-0.26 per month would fund drainage projects.

8 mentions (5 this month)Last discussed Oct 29, 2026
HighRoads

Downtown mobility and parking study

The Walker Consultants study found downtown parking supply is generally adequate — about 30,000 publicly available spaces — so no new parking garage is recommended at the Alamodome Lot A. Instead, recommendations focus on wayfinding, parking discovery technology, and shifting trips to transit and ride share.

1 mention (1 this month)Last discussed Oct 28, 2026
HighRoads

Silver Line Station Area Plan & Multimodal Corridor Studies

Planners are mapping out how transit stations and major corridors like Marbach, Harry Wurzbach, and West Avenue can be made safer and more accessible for everyone.

1 mention (1 this month)Last discussed Oct 13, 2026
HighRoads

Citywide Street Maintenance and Mastic Sealer Procurement

San Antonio is planning a $796,825 street maintenance project to apply slurry seals, striping, and pavement markings across local roadways. This work aims to extend the lifespan of neighborhood streets and improve traffic safety.

5 mentions (2 this month)Last discussed Oct 1, 2026
HighRoads

Residential Streetlight Gap Program

City staff reported on the five-year progress of closing streetlight gaps, while council members debated funding sources, community pushback against unwanted lights, and better ways to target high-need areas.

2 mentionsLast discussed Sep 23, 2026
HighRoads

Transportation and Sidewalks in District 1

Candidates discussed the lack of safe pedestrian walkways, inadequate bus shelters, and the need for better public transit options like rail and dedicated bus lanes to connect East Austin without increasing flood risks.

Last discussed Sep 14, 2026
HighRoads

Infrastructure Funding

The city is planning its budget and bond program for the next few years. This will determine which streets and sidewalks get fixed or built.

5 mentions (1 this month)Last discussed Sep 9, 2026
HighRoads

Infrastructure Project Scoring Framework

The city is evaluating proposed street, bridge, and sidewalk projects using a new scoring framework based on established guiding principles to prioritize capital investments.

1 mentionLast discussed Aug 3, 2026
HighRoads

Citywide Street Pavement Preservation

The city is moving forward with multiple task order contracts totaling over $1.7 million to handle crack sealing, spray patch sealing, and concrete flatwork repairs across local roadways. These maintenance packages aim to extend the lifespan of neighborhood streets and improve pedestrian infrastructure.

2 mentionsLast discussed Jul 9, 2026
HighRoads

District 9 Traffic and Mobility Improvements

A new turn lane, sidewalk, and traffic signal relocation on Stone Oak Parkway and Evans Road will ease congestion and improve pedestrian safety.

1 mentionLast discussed Jun 11, 2026
HighRoads

Public Works Street Maintenance and Engineering Review

The city is investing in asphalt materials, wheelchair ramps, and an independent engineering review of its street maintenance program to improve roadway conditions.

2 mentions (1 this month)Last discussed Apr 30, 2026
HighRoads

VIA Rapid Green Line Transit Stop at Central Library

The board considered a Facilities Committee recommendation regarding the placement of a VIA North/South Rapid Green Line transit stop at the Central Library, impacting commuter access.

1 mentionLast discussed Mar 25, 2026
HighRoads

Watson Road Phase 2 Design

Engineering design is underway for Watson Road Phase 2 in District 4, bringing new sidewalks, a shared-use path, and a roundabout to improve traffic flow and pedestrian safety.

1 mentionLast discussed Jan 29, 2026
HighRoads

Harry Wurzbach Highway Improvements

The city is moving forward with design services to widen Harry Wurzbach Highway in District 2, adding protected bike lanes and pedestrian upgrades to improve safety for all road users.

1 mentionLast discussed Jan 29, 2026